Background
Abstract
from the report:
At the
request of Director, National Reconnaissance Office (NRO), the NRO Office of
Inspector General (OIG) conducted an Inspection of Program-S. The final
inspection report is attached. This report contains no formal recommendations.
However, the OIG provided a draft report to key stakeholders for technical
accuracy review prior to final issuance, and the [
REDACTEDREDACTEDREDACTEDREDACTEDREDACTEDREDACTEDREDACTED ] requested an
opportunity to provide management comments. Management comments are included in
Appendix A of this report.
The below is
the declassified OIG report, but sadly, not much can be deduced on what
PROJECT-S actually is. I have filed additional requests to see what may exist.
Declassified Document
NRO
Investigation: Inspection of Program-S, Closed 5/5/15 [25 Pages, 2.4MB]